waterproofing REF. NO. DATE TO K.A. CONTACT SITE Scope of Work Washroom, Wet Areas & BalconiesTerrace AreaWater Tank / STP / Fire TankSwimming Pool / Water BodiesPodium HardscapePodium Softscape / Terrace GardenBasement Wall - Positive SideRetaining Wall - Negative SideGeneral Rates 1. Washroom, Wet Areas & Balconies A - Prima + Aarcee 2K (5 Years) Rs.32/sqftB - Prima + 2K Plus (7 Years) Rs.40/sqftC - Prima + Exaflex (10 Years) Rs.55/sqft Additional Items: Pipe Core Filling Rs.500BBC / Block Coba Rs.25IPS Rs.20Construction Joint Rs.100 2. Terrace Area A - Prima + 2K Plus + FGM 45 (7 Years) Rs.45/sqftB - Prima + Exaflex + FGM 45 (10 Years) Rs.60/sqftC - Aarpozy Primer + Puthane (12 Years) Rs.80/sqft Additional Items: Pipe Core Filling Rs.500BBC / Block Coba Rs.25IPS Rs.20Construction Joint Rs.100Protective Layer (GT120) Rs.5 3. Water Tank / STP / Fire Tank A - Prima + 2K Plus (7 Years) Rs.45/sqftB - Prima + Exaflex (10 Years) Rs.60/sqft Additional Items: Pipe Core Filling Rs.500BBC / Block Coba Rs.25IPS Rs.20Protective Plaster Rs.25Construction Joint Rs.100 4. Swimming Pool / Water Bodies A - Prima + 2K Plus + FGM 45 (7 Years) Rs.45/sqftB - Prima + Exaflex + FGM 45 (10 Years) Rs.60/sqftC - Aarpozy Primer + Puthane (12 Years) Rs.80/sqft Additional Items: Pipe Core Filling Rs.500BBC / Block Coba Rs.25IPS Rs.20Protective Plaster Rs.25Construction Joint Rs.100Protective Layer (GT120) Rs.5 5. Podium Hardscape A - Prima + 2K Plus + FGM 45 (7 Years) Rs.45/sqftB - Prima + Exaflex + FGM 45 (10 Years) Rs.60/sqftC - Aarpozy Primer + Puthane (12 Years) Rs.80/sqft Additional Items: Pipe Core Filling Rs.500Protective Layer (GT120) Rs.5Construction Joint Rs.100 6. Podium Softscape / Terrace Garden A - Prima + 2K Plus + FGM 45 (7 Years) Rs.45/sqftB - Prima + Exaflex + FGM 45 (10 Years) Rs.60/sqftC - Aarpozy Primer + Puthane (12 Years) Rs.80/sqft Additional Items: Pipe Core Filling Rs.500Protective Layer (GT120) Rs.5BBC / Block Coba Rs.25IPS Rs.20Construction Joint Rs.100Protective Coating Rs.45Drain Board + Filter Layer Rs.50 7. Basement Wall - Positive Side A - Prima + Aarcee 2K (5 Years) Rs.32/sqftB - Prima + 2K Plus (7 Years) Rs.40/sqft Additional Items: Tie Rod Removing & Filling Rs.20Construction Joint Rs.100 8. Retaining Wall - Negative Side A - Crystal Coat (5 Years) Rs.50/sqft Additional Items: Tie Rod Removing & Filling Rs.20Construction Joint Rs.100 9. General Rates Cementitious Pressure Grouting Rs.500PU Injection Grouting Rs.1200Depart Labour Rs.700 Estimated Total:0 Selected Items: None Terms & Conditions 1 Required Electricity, Lockable Store, Sand, Bricks, Blocks, Cement, Grit, Water, Lift etc. shall be provided by client at free of cost. 2 Stay for Labour in Labour Colony or space on site shall be provided by client at free of cost. 3 Quantity shall be considered only as per actual treated area on site. 4 GST @ 18% shall be extra. 5 Work shall commence only after receiving of Work Order. 6 Cost of removal of macro cleaning shall be extra. 7 Site shall be executed by our authorised applicator. 8 Treatment conditions can be considered for revision in case of any situation on site. 9 If lead is more for material picking up on site, extra charges shall be levied as per site situation and shall be pre-informed. Payment Terms 40% Advance Against Material Delivery on Site, 40% As Per Running Work in Progress, and 20% within 7 Days of Completion of Work Contact Details 1 BDE 2 Ms. Nidhi Thakkar +91 70 48 48 7829